Published on March 13, 2024
(PLACERVILLE, CA) – The El Dorado County Department of Transportation, in conjunction with the Federal Highway Administration, Central Federal Lands Highway Division, will be performing road work on Ice House Road between the intersection of Peavine Ridge Road to the junction of Wentworth Springs Road in the Eldorado National Forest, beginning in May 2024 and continuing through November 2024. The construction work will require lane closures for which motorists should expect up to 30-minute maximum delays during the day and up to 60-minutes at night, Monday through Friday.
The closures are necessary to ensure motorist and worker safety while the contractor begins construction of resurfacing, restoration, and rehabilitation of 17.57 miles of roadway.
The County sincerely appreciates the cooperation and patience of motorists that use these roadway facilities.
For questions regarding this construction, please contact the County's Transportation main line at (530) 621-5900 (select Option 3 for Engineering).
###
Exceptional quality of life with a strong sense of community, rural character, managed growth, and opportunity for all.